Sump tank and a centrifugal pump etc. Flow control valve and by-pass valve are fitted in water line. The set-up consists of different pressure measurement devices fitted in a pipe line, in which an Orifice is fitted to create the pressure difference.
Learning Objects/Experimentation:
To measure the pressure and pressure difference by pressure gauge, single column manometer, U Tube manometer & Inclined tube manometer.v
To demonstrate the working of different pressure measuring devices.
Requirment For Operation:
Water Supply (Initial fill)
Floor Drain required.
Electricity Supply: Single phase, 220 VAC, 50 Hz, 5-15 amp.
Combined socket with earth connection.
Mercury (Hg) for manometer (750 gm).
Floor Area Required: 1.5 m x 0.75 m.